Walk · Analyse · Improve
Your runway coach.
Film a walk. Défilé scores it out of 100, shows you the one thing holding it back, and gives you a short drill to fix it.
On iPhone now · Android coming soon
How it works
Film. Score. Fix.
No guesswork, and no list of twenty corrections. Each walk you film gets you one focus.
Film your walk
Record a few steps from the front or the side, or upload a clip you already have.
Get your walk score
A score out of 100, based on how you actually move: your posture, your line and how steady you are.
Work on one thing
One focus for each walk, with a short guided drill that has a timer and a cue for every step.
Inside the app
One focus. Every walk.
Compare walks you filmed the same way, keep a streak going and watch your score climb.
Free guides
Guides to practise with.
Short, step-by-step guides to walking, posture and presence. Practise them, then film your walk to see where you are.
Private by design
Your video never leaves your phone.
- 01Your walk is analysed on your device. No frames, photos or audio are uploaded.
- 02The app deletes its copy of the clip as soon as the analysis is done.
- 03No ads and no tracking. Read the privacy policy.


